Track Access Road to Ammunition Depot Schneeberg

Customer: Oevermann Verkehrswegebau GmbH
Client: Town Friedland, Ingenieurbüro Hoch- und Tiefbau eG, Architekten und Ingenieure, 15890 Eisenhüttenstadt
Scope of Work: Installation of Concrete Pavement on Track Road with Slipform Paver
Construction Time: 03/2013 – 05/2013
Joints Installation: 9200 m² of Concrete Pavement in form of Track Road
Built-in Fitments: 400 m

The track road construction was carried out in two sections from the bridge towards Oelsen and from the bridge towards the ammunition depot.
The access road consists of two separate tracks with concrete pavement of standard width 1.75m. Several passing points were made in the route with a width of 2.50m. In these areas, as well as in curves the concrete pavement was made for a full road width of 4.50m. For the passing places on both sides mobile shoulders were arranged. The 1 m wide median strip was filled with gravel and seeded with grass. We used our own slipform paver Wirtgen SP 500 for pavement installation.
The track access road was completed within the specified period in constructive cooperation with the Customer and free of defects was handed over to the complete satisfaction of the Client.